Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Sultan Resources
ACN: 623 652 522
CORPORATE DETAILS
ASX Code: SLZ
DIRECTORS
JEREMY KING
CHAIRMAN
STEVE GROVES
NON-EXECUTIVE DIRECTOR
ASX ANNOUNCEMENT
30 April 2024
MARCH QUARTERLY REPORT
For the period 1 s t January – 31 s t March 2024
DAVID LEES
NON-EXECUTIVE DIRECTOR
CONTACT
Suite 11
23 Railway Road
Subiaco WA 6008
www.sultanresources.com.au
Sultan Resources Limited (“SLZ” or “the Company”) is pleased to provide shareholders with the following update for the
Company’s activities for the quarter ended 31st March 2024.
WA PROJECTS
LAKE GRACE PROJECT
The Lake Grace Project consists of five large tenements (E70/5081, 5082, 5085, 5095 and 5179- refer Figure 5) in the Southwest
Terrane of Western Australia, containing the Calesi Ni Prospect and Kulin Hill Ni-Co Project in the North, and the Lake Grace Gold
Project in the South, surrounding the Griffin’s Find Gold Mine.
Calesi Ni Prospect- Rio Farm-in Tenement (E70/5082)
Background:
Rio Tinto Exploration Pty Limited (RTX) and Sultan have entered into option to farm-in and joint venture agreement in respect
of E70/5082, a portion of Sultan’s Lake Grace tenure (refer ASX announcement 21/6/2023). The agreement allows RTX to
undertake preliminary exploration during an initial option period and then earn an 80% interest in E70/5082 by way of $2m of
exploration spend within 5 years, with Sultan retaining full ownership of its principal area of focus to date (Kulin Hill tenure on
E70/5095). Previously, RTX had identified a strong untested late time conductivity anomaly from a single line SKYTEM response
in the northern part of E70/5082, from 20km line-spaced data, coincident with a circular magnetic and radiometric anomaly,
which formed the basis for RTX’s entry to the option and farm-in arrangement.
In mid-August 2023, NRG Geophysics were contracted to fly a detailed (100m line-spaced) helicopter-borne time-domain
electromagnetic (HTDEM) survey totalling around 80-line km over an area approximately 4km SW of the wheatbelt town of Kulin
(refer Figures 4, 5). The Company subsequently released images and interpretation of the data by the Company and RTX, with
the heli-borne EM survey outlining a significant EM response over 750m in length and 230m in width, which may resolve to two
targets with further investigation (refer Figures 1 & 2), characterised by a strong late-time signal. The Company and RTX consider
the geological setting and EM response is suggestive of potential for magmatic nickel sulfide mineralisation (refer Figure 2).
Preliminary modelling of the target was completed by RTX consultants, with target depths for modelled plates starting from
approximately 70m below surface. Planning for initial RC Drilling to confirm the nature of the geophysical anomaly was
completed, with Programme of Works (PoW) approval received, providing for 2 Reverse Circulation (RC) holes (refer Figure 1
inset) to test the anomaly for proof of concept, followed by diamond drilling if required. The RC holes were planned for depths
of up to 350m, designed to penetrate the modelled target from 70m vertical, and intended to confirm the geometry of the
anomaly ahead of potential follow-up diamond drilling. RTX have formally exercised their option to earn in to 80% of E70/5082,
and are sole-funding the drilling campaign, to be managed by Sultan.
ASX ANNOUNCEMENT –30 APRIL 2024
Activities:
Two Reverse Circulation (RC) holes totalling 560m were completed during March of 2023 completed at Calesi prospect,
approximately 5km south-west of Kulin in the wheatbelt of WA. CLRC001-002 were drilled to depths of 210 and 350m
respectively. Both holes were cased for Downhole Electromagnetic (DHEM) surveys, and a subsequent Fixed Loop EM survey.
Drilling intercepted bands of variably silicified and occasionally sulfide-rich mafic amphibolite, interbedded with a felsic unit,
provisionally identified in the field as a tonalite, passing to a granitic basement at around 300m downhole. The dominant sulfide
was pyrrhotite, and no support for magmatic nickel sulfides was observed in drilling.
The Company submitted 5m composite samples to ALS laboratory for gold and multi-element analysis. The Company will inform
the market with additional information as it and farm-in partner Rio Tinto Exploration receive and work through the data.
Photo 1: Hagstrom Drill rig completing CLRC002 at Calesi Prospect, south-west of Kulin, WA
page 2
ASX ANNOUNCEMENT –30 APRIL 2024
Figure 1: Channel 24Z EM response image overlain on aerial photography and magnetic response, with
tenement E70/5082 highlighted. Initial two-hole RC drill traverse highlighted in inset.
page 3
ASX ANNOUNCEMENT –30 APRIL 2024
Figure 2: Overview Plan of Sultan’s Kondinin-Lake Grace Project in the Southwest Terrane of WA, with RTX
farm-in/JV tenement E70/5082 and current area of interest highlighted.
page 4
ASX ANNOUNCEMENT –30 APRIL 2024
TABLE 1: Drill Hole details- Calesi Prospect
HOLE_ID
Northing
Easting
CLRC001
6381500
605510
CLRC002
6381481
605477
RL (est)
332
332
Dip
-60
-60
Azimuth
060
060
Depth
210
350
Previous ASX announcements related to this Project are listed below:
SLZ:ASX announcement 21/06/23: “Rio Tinto and Sultan enter into Option and JV Agreement”
SLZ:ASX announcement 16/08/23: “Helicopter EM Survey Commences at Rio-Sultan Ground”
SLZ:ASX announcement 24/10/23: “EM Survey Confirms Significant Geophysical Anomaly”
SLZ:ASX announcement 14/12/23: “Calesi Nickel Prospect Update”
SLZ:ASX announcement 20/02/24: “Calesi Drilling Preparations Update”
SLZ:ASX announcement 6/03/24: "Calesi Nickel Prospect Drilling to Commence”
SLZ:ASX announcement 14/3/24: “Calesi Prospect Drilling Completed”
The Company offers the following proximate cautionary statement in respect of visual estimates:
‘Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses
where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially
provide no information regarding impurities or deleterious physical properties relevant to valuations.’
Discussion of visuals estimates: Observed pyrrhotite mineralisation was typically disseminated, very rarely massive, with
typical concentrations of 1-2% to a maximum of 15% in mafic amphibolite units. Pyrite and rare chalcopyrite was also
observed in logging. Initial assay results for 5m composite samples are expected by end of March.
Khal (Previously Kulin Hill) Nickel-Copper-PGE Project (E70/5095)
Figure 3: Plan view of 1VD magnetic signature representing the >2km long, 700m wide ultramafic sequence overlain by aerial
photography highlighting the salt lake, with Reserve 18455 (Lot 225568) highlighted in red. Sultan’s 2022 aircore collars are
marked in orange, and previous diamond drilling traces in yellow, with recent SLGDD001 named. Orange circles and traces
indicate possible drilling collar positions to test the layered intrusion from the salt lake surface.
page 5
ASX ANNOUNCEMENT –30 APRIL 2024
Sultan’s principal area of focus is the Khal (previously Kulin Hill) Nickel-Copper-PGE Project on E70/5095, where a greater than
2km long/700m wide ultramafic/mafic package, characterised by a strong magnetic signal coincident with a salt lake surface
expression is under investigation (refer Figure 3). The potential for Ni-Co sulfide mineralisation was suggested by historical
drilling conducted on the edge of the sequence in 1967 and 1973, where drill core samples were observed in polished sections
containing “…less than 1% of a nickel-cobalt-sulphide mineral (approximately 50% Ni, 5% Co)1”, which suggests that the sequence
is fertile and is a priority target for magmatic Ni-Co sulfides. Observations from the historical drilling also supported some
fractionation of the ultramafic at depth; that is, towards the untested central portion of the sequence.
Previous 2022 aircore drilling from available sites at the project by Sultan returned anomalous results of Ni, Cr, Mg, Fe, S and Co
consistent with weathered ultramafic lithologies. The Company contends that further drilling into the ultramafic sequence will
support that it is fertile and can host precipitated Ni-Co sulfides. Sultan drilled stratigraphic drill hole SLGDD001 in late 2022 to
partially test a portion of the Kulin Hill magnetic anomaly (refer Figure 3). The thick intersection of layered ultramafic geology,
along with evidence for the potential remobilisation of sulfides from an ultramafic source in SLGDD001 confirmed the
prospectivity of the 2.2km long main target for Ni-Co mineralisation. Interpretation of the geology of the sequence is ongoing.
Access to Reserve 18455
As previously advised, negotiations to access the full extent of the target area for drilling, the majority of which extends beneath
salt lake Reserve 18455 (refer Figure 3), have been ongoing since early 2022, with the Company receiving confirmation of access
from DMIRS during late last year; however ground conditions have been unsuitable since receiving permission to drill.
The Company is working an alternative all-weather drilling collar to effectively test the target should access to the salt lake not
be available. The Company remains in communication with a suitable diamond drilling contractor with suitable depth and low
angle capacity, small footprint including lightweight tracked mobility, and solids and water management capacity to responsibly
undertake this work.
1.
A Report 7659 “Final Report Corrigin Project, Electrolytic Zinc Company of Australasia Limited” dated 1973
For further detail on the Kulin Hill/ Lake Grace Nickel Project please refer to the following:
Sultan (ASX:SLZ) ASX Announcement: 2021 “WA Nickel Project Update” dated 3/06/2021
Sultan (ASX:SLZ) ASX Announcement: 2021 “Drilling for WA Julimar-style Nickel Targets to Commence” dated 23/11/2021
Sultan (ASX:SLZ) ASX Announcement: 2021 “Aircore Drilling Commenced at Lake Grace” dated 16/12/2021
Sultan (ASX:SLZ) ASX Announcement: 2022 “Aircore Drilling Recommences at Lake Grace” dated 12/01/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Exploration Update” dated 3/02/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Aircore Results for Kulin Hill NI-Sulphide Target Received” dated 4/05/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Sultan to Drill Nickel Targets” dated 22/06/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Diamond Drill Hole Commences at Kulin Hill Nickel Project” dated 14/10/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Diamond Drill Hole Completed at Kulin Hill Nickel Project” dated 16/11/2022
Sultan (ASX:SLZ) ASX Announcement: 2023 “Initial Geochemistry Confirms Target Geology at Kulin Hill” dated 17/02/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Kulin Hill Nickel - Diamond Hole Confirms Prospectivity” dated 19/04/2023
Lake Grace Gold Project (E70/5081, E70/5085, E70/5179)
No active fieldwork undertaken during the quarter. E70/5081, E70/5082, E70/5085 and E70/5095 have recently been extended
for an additional five-year terms. A five-year extension of Term for E70/5179 was approved post quarter-end.
THADUNA PROJECT (E52/3481)
No active fieldwork undertaken during the quarter.
page 6
ASX ANNOUNCEMENT –30 APRIL 2024
CANADIAN LITHIUM PROJECTS
Sultan has two 100% owned lithium projects in Ontario, Canada, where initial reconnaissance assays were reported from the
Ruddy Project during the last field season, with low K/Rb ratios established for high proportion of pegmatites sampled, and a
priority lithium target area identified within an interpreted ‘Goldilocks’ Zone for further work confirmed and refined.
RUDDY PROJECT
At Ruddy, the Company has established a priority exploration target from the interpreted LCT Goldilocks Zone surrounding the
Allison Lake Batholith which covers approximately 3.5km of east-west strike in the centre to south of the Company’s Project.
After receipt of the assays, the results supported a priority zone of interest within the original LCT Goldilocks interpretation,
radially distributed from the northern portion of the Allison Batholith, and highlight a priority target (Refer Figures 4-7) for
further assessment in the SE portion of the Ruddy tenure. Due to the Canadian field season in NW Ontario, no active field
work was undertaken during the quarter.
Photo 2. Aerial view across Ruddy Project looking East, Ruddy Lake in background.
KEMBER PROJECT
At the Kember Project (refer Figure 8 &10), the Company had previously advised that a desktop review highlighted a series of
pegmatitic granite occurrences in mapping previously conducted at its Kember Project, noted across an area around seven km in
length and typically over a kilometre in width. These will form a focus of initial exploration activities at the Kember Project.
The Company has opted to delay reconnaissance activities at Kember after one of four First Nation groups with established rights
in the area requested additional time to inform its members of planned activities, which could not be resolved before the onset
of the Canadian winter and the cessation of the current field season.
The Company is continuing to advance negotiations with this and other FN group and expects first pass reconnaissance exploration
of Kember in the current field season, ideally to combine with additional groundwork at the priority target at Ruddy, which can be
combined in daily helicopter flights out of Red Lake, ON.
page 7
ASX ANNOUNCEMENT –30 APRIL 2024
Figure 4: Li20 Assays reporting above 100ppm at Ruddy Project in relation to tenure (refer Table 1).
Priority Zone area of focus for LCT Pegmatites in hatched area
Figure 5: Pegmatite locations demonstrating lower K/Rb ratios considered indicative of more evolved pegmatitic occurrences,
and a vector for LCT pegmatite mineralisation.
page 8
ASX ANNOUNCEMENT –30 APRIL 2024
Figure 6: All sampled sites at Ruddy Project from June 2023 reconnaissance, includes reclassified pegmatitic occurrences.
Figure 7: Pegmatite sites at Ruddy Project; evolved pegmatites with fractionation minerals denoted by darker blue locations.
Geology after Fingus, 20222.
page 9
ASX ANNOUNCEMENT –30 APRIL 2024
ABOUT THE RUDDY LITHIUM PROJECT
The Ruddy Project (Figures 4-9) directly abuts ground to the west held by Green Technology Metals Limited (ASX: GT1) and is
located in the province of Ontario about 162km north-north-east of the town of Dryden. The Project covers around 10km2 and
sits on the northern extremity of the Allison Lake Batholith, a fertile intrusive responsible for the development of proximal
fractionated pegmatites with potential to host lithium, caesium and tantalum (LCT) mineralisation2,3,4.
Although there has been limited exploration over the Ruddy Project claims, previous study of the area by the Ontario Geological
Survey (Breaks et al 20033) described the margin of the Allison Lake Batholith at the time as “…an important new exploration
target for rare-element mineralization and is the largest such granite thus far documented in Ontario…”.
Breaks et al 20033 considered the margin of the Batholith had high potential for further discoveries of rare element
mineralization that could occur in exo-contact, metasedimentary-hosted pegmatites or as internal pegmatites within the parent
granite, particularly in light of the common regional zonation sequence of rare-element pegmatites from beryl-rich into lithiumrich types. This typically includes spodumene-type pegmatites in an interpreted ‘LCT Goldilocks Zone’ of increased fractionation
from the parent granite. With recent renewed interest in rare element mineralisation, the prospective Allison Batholith has
emerged as a fully staked, multi-company, battery mineral exploration region.
Reports by Green Technology Metals4 describe the identification of the spodumene-bearing Ouroboros Pegmatites
approximately 10km southwest of the Ruddy Project (refer Figure 9) in a similar geological setting, which the Company considers
highly encouraging. The Company is focusing exploration at Ruddy at outcrop within the interpreted LCT Goldilocks Zone
surrounding the Allison Lake Batholith, covering approximately 3.5km of east-west strike in the centre to south of the Company’s
Project.
ABOUT THE KEMBER LAKE LITHIUM PROJECT
The Kember Project (Figures 8 and 10) is located in the province of Ontario about 180km north of the town of Red Lake, covering
an area of around 30km2. Demonstrating the prospectivity of this area, the Kember Project is located about 8km from the
PAK/Bolt/Spark lithium deposits of Frontier Lithium Inc. (Frontier) and is contiguous with this project tenure.
Recent drilling by Frontier intersected 398.25m of pegmatite averaging 1.88% Li2O, including a 23.4m zone of 3.12% Li2O (see
TSX.V Announcement 8/02/2023). Frontier have also recently announced resources totalling 58.5Mt @ 1.51% Li2O from its most
recent NI43-101 instrument effective April 28th 2023, calculated from two of four known spodumene-bearing pegmatite
occurrences within its PAK Project holdings.
There has been no recorded exploration over the Kember Project area, however, mapping by the Geological Survey of Ontario
has historically recorded the presence of pegmatitic granites over a northwest to southeast zone around seven km in length and
typically over a kilometre in width, providing an initial zone of interest.
These pegmatitic granites will be the focus of initial reconnaissance of 5 to 7 days duration, with four helicopter-supported
geologists from Canadian-based experienced geological consultants, APEX Geoscience conducting mapping and sampling of
priority outcrop. The Company considers rare element mineralisation can occur associated with internal pegmatites within the
parent granite. The Company will also conduct reconnaissance of the eastern edge of the project, closer to changes in granitic
composition and contact morphologies.
References
2. Fingas, J, 2022: Assessment Report on Crown Land for the Costello Lake Area – 2021 Prospecting Program, dated May 25th 2022
3. Breaks, F.W., J.B. Selway J.B and A.G. Tindle A.G. 2003, Ontario Geological Survey, Open File Report 6099, Fertile Peraluminous Granites and Related RareElement Mineralization in Pegmatites, Superior Province, North-West and North-East Ontario: Operation Treasure Hunt
4. Green Technology Metals (ASX:GT1) ASX Announcement: “Strategic lithium footprint substantially expanded” dated 24/01/2022
page 10
ASX ANNOUNCEMENT –30 APRIL 2024
Figure 8: Location of Kember and Ruddy Projects in relation to known Lithium deposits, Northwest Ontario
N.B. PAK (TSXV:FL) total resource taken from NI43-101 instrument effective April 28, 2023
Mavis resource (ASX:CRR) taken from ASX release dated June 7, 2023
Root Bay, Seymour Lake and McCombe resources (ASX:GT1) taken from ASX release dated May 5, 2023
Georgia Lake (TSXV:RCK) total resource taken from Georgia Lake Project: Pre-Feasibility Study Nov 22, 2022
Separation Rapids (TSX:AVL) total resource taken from NI43-101 instrument effective Sept 26, 2018
Jackpot (Imagine Lithium- private) estimate taken from Ontario Mineral Inventory Record: MDI42E05SW00019; resource is historic and not
compliant with formal resource reporting.
page 11
ASX ANNOUNCEMENT –30 APRIL 2024
Figure 9: Location of Ruddy Project in relation to regional geology, known pegmatite occurrences (detail sourced from ASX:GT1
Announcement on 24/01/20224), and neighbouring tenure holders.
page 12
ASX ANNOUNCEMENT –30 APRIL 2024
Figure 10: Location of Kember Project in relation to regional geology and known spodumene-hosted Lithium deposits,
Northwest Ontario.
For further detail on the Kember and Ruddy Projects please refer to the following:
Sultan (ASX:SLZ) Announcement: 2023 “Sultan Resources enters agreement to acquire 100% interest in highly prospective Canadian lithium exploration ground in Ontario,
Canada” dated 17/03/2023
Sultan (ASX:SLZ) Announcement: 2023 “Sultan Completes Acquisition of Canadian Lithium Projects” dated 25/05/2023
Sultan (ASX:SLZ) Announcement: 2023 “Sultan Appoints Experienced Canadian Geological Team” dated 1/06/2023
Sultan (ASX:SLZ) Announcement: 2023 “Multiple mapped pegmatitic occurrences Kember Lithium Project” dated 14/06/2023
Sultan (ASX:SLZ) Announcement: 2023 “Multiple Pegmatite occurrences noted as exploration commences at Ruddy Project, North-Western Ontario” dated 26/6/2023
Sultan (ASX:SLZ) Announcement: 2023 “Priority Zone Identified at Ruddy Lithium Project, Ontario” dated 25/07/2023
Sultan (ASX:SLZ) Announcement: 2023 “Results Received at Ruddy Lithium Project” dated 22/09/2023
page 13
ASX ANNOUNCEMENT –30 APRIL 2024
LACHLAN FOLD BELT PROJECT, NSW (EL8734, EL8735, EL9070)
During the quarter, Sultan continued to review exploration data across its suite of porphyry and epithermal exploration targets
in the Macquarie Arc volcanic rocks of the Lachlan Fold Belt, NSW (refer Figure 14). No field work was undertaken, with further
review required to define the next round of exploration and drill targets across the projects. Some planning of further
extensional soil sampling of the main anomalism is planned for Tucklan (EL8734).
Ringaroo
Big Hill,
Razorback
Figure 14: NSW- Sultan Tenements located over prospective Macquarie Arc sequence rocks with priority targets indicated.
CORPORATE
In March 2024, the Company completed its non-renounceable Entitlement Offer (Offer) and Shortfall Offer Placement. The
Offer was made to eligible shareholders registered on 9 February 2024, who were offered to subscribe for one (1) share
(New Share) for three (3) existing shares of the Company at an issue price of $0.014 per New Share to raise up to $691,553
(before costs), together with one (1) free-attaching listed option (exercisable at $0.03 and expiring 3 years from the date
of issue) (New Options) for every three (3) New Shares subscribed for and issued (Offer). The Company received valid
applications for 17,516,253 New Shares and 5,838,720 New Options, raising a total of $245,228.02 (before costs) under
the Offer. A total of 31,880,187 New Shares together with associated free attaching New Options (collectively, the
Shortfall Securities) were placed via the Shortfall Offer Placement. The New Shares and New Options applied for by
Eligible Shareholders under the Offer were issued on 12 March 2024 and the Shortfall Securities were issued on 14 March
2024.
page 14
ASX ANNOUNCEMENT –30 APRIL 2024
The Offer was fully underwritten by Still Capital Pty Ltd (ABN 33 647 521 603) (Underwriter) in accordance with the
underwriting agreement between the Company and the Underwriter (Underwriting Agreement). The Company agreed
to compensate the Underwriter by paying a 5% underwriting fee and 16,465,5610 New Options representing one (1) New
Option for every three (3) New Shares underwritten. The Underwriter entered into a sub-underwriting agreement with
Director, Mr Jeremy King to sub-underwrite the Offer up to the value of $40,000 (being 2,857,142 New Shares and 952,380
New Options) (Sub-Underwriting Agreement). Mr King received a 4% sub-underwriting fee on the amount subunderwritten and (subject to shareholder approval) 952,380 Underwriter Options. The Underwriter is responsible for any
fees payable to any sub-underwriters or other brokers involved in the Offers.
The Company’s Joint Lead Managers to the Offer and Shortfall Offer Placement were Arq Capital and Xcel Capital who
were paid a management fee of $60,000 (plus GST) and, subject to shareholder approval, 10,000,000 Options on the same
terms as the New Options.
The proceeds of the Offer and Shortfall Offer of $691,553 (before costs) will be used towards groundwork for Canadian
Lithium assets, preparation for drilling at Kulin Hill prospect, expenses of the Offer and for general working capital.
Sultan’s cash position as at 31 March 2024 was ~$0.96 million.
ADDITIONAL ASX INFORMATION
ASX Listing Rule 5.3.1
Exploration and Evaluation during the quarter was ~$106,000.
ASX Listing Rule 5.3.2
There was no substantive mining production and development activities during the quarter.
ASX Listing Rule 5.3.5
Payments to Related Parties & their Associates
Total Amount
Director Fees and Superannuation
$38,850
Company Secretarial, Registered Office and Financial Management Services
$45,525
page 15
ASX ANNOUNCEMENT –30 APRIL 2024
ASX Listing Rule 5.3.3
SCHEDULE OF TENEMENTS
Western Australia
Tenement
Holder
Status
Area
Sultan Resources
Live
1 block
Application
Required
Grant Date
Expiry Date
19/10/2016
8/02/2018
7/02/2028
$15,000
Date
Expenditure
Thaduna Project
E52/3481
Lake Grace Project
E70/5081
Sultan Resources
Live
58 blocks
21/11/2017
23/07/2018
22/07/2028
$116,000
E70/5082
1
Sultan Resources
Live
37 blocks
23/11/2017
31/07/2018
30/07/2028
$74,000
E70/5085
Sultan Resources
Live
65 blocks
24/11/2017
23/07/2018
22/07/2028
$124,000
E70/5095
Sultan Resources
Live
54 blocks
1/12/2017
31/07/2018
30/07/2028
$108,000
E70/5179
Sultan Resources
Live
28 blocks
1/6/2018
5/02/2019
04/02/2029
$52,000
E70/6529
Sultan Resources
Live
1 block
15/8/2023
18/10/2023
17/10/2028
$10,000
E70/6530
Sultan Resources
Live
2 blocks
15/8/2023
23/10/2023
22/10/2028
$15,000
E70/6531
Sultan Resources
Live
14 blocks
15/8/2023
23/10/2023
22/10/2028
$20,000
Status
Area
Grant Date
Expiry Date
New South Wales
Tenement
Holder
Application
Date
Required
Expenditure
Lachlan Fold Belt Project
EL 8734
Colossus Metals
Live
16 Units
NA
16 April 2018
16 April 2025
$150,000
EL 8735
Colossus Metals
Live
37 Units
NA
16 April 2018
16 April 2025
$250,000
EL 9070
Sultan Resources
Live
4 Units
NA
2 March 2021
2 March 2027
$14,000
Holder
Status
Area
Grant Date
Expiry Date
Perry English
Live
22 cells
NA
27/02/2022
27/02/20243
$8,800
Perry English
Live
14 cells
NA
27/02/2022
27/02/2024
3
$5,600
Perry English
Live
16 cells
NA
27/02/2022
27/02/2024
3
$6,400
Canada 2
Tenement
Application
Date
Required
Expenditure
Ruddy Project
711362
711363
711364
Kember Project
705989
Gravel Ridge
Live
25 cells
NA
08/02/2022
26/03/2025
$10,000
705990
Gravel Ridge
Live
25 cells
NA
08/02/2022
26/03/2025
$10,000
705991
Gravel Ridge
Live
25 cells
NA
08/02/2022
26/03/2025
$10,000
705992
Gravel Ridge
Live
25 cells
NA
08/02/2022
26/03/2025
$10,000
705993
Gravel Ridge
Live
25 cells
NA
08/02/2022
26/03/2025
$10,000
705994
Gravel Ridge
Live
25 cells
NA
08/02/2022
26/03/2025
$10,000
The mining tenements relinquished during the quarter and their location –
Nil
The mining tenement interests acquired during the quarter and their location –
Nil
Beneficial percentage interests held in farm-in/farm-out agreements at the end of the quarter –
100% in E70/5082
Beneficial percentage interests held in farm-in/farm-out agreements acquired/disposed of during the quarter - Nil
123-
E70/5082 subject to farm in by Rio Tinto Exploration- see SCN:ASX release dated 21st June 2023
All Canadian tenure in process of being transferred to Sultan, Kember tenure all transferred to Gravel Ridge ahead of transfer
Technical reporting and compliance documentation completed, awaiting updated expiry date at time of writing
page 16
ASX ANNOUNCEMENT –30 APRIL 2024
This announcement is authorised for release by the Board.
For further information contact:
Director
Jeremy King
info@sultanresources.com.au
Cautionary Statement: Investors are cautioned that information contained within this release in respect of pegmatite
occurrences is not necessarily indicative of lithium mineralization on the property, and that preliminary exploration
observations will need to be backed by laboratory analysis to ascertain the prospectivity of the mineral claims, and there
is no guarantee that a significant discovery will be made as a result of its exploration efforts.
Competent Persons Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on historical and
recent exploration information compiled by Mr Craig Hall, who is a Competent Person and a Member of the Australian
Institute of Geoscientists (#1748) and a fulltime employee of Sultan Resources Limited. Mr Hall has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for the reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr Hall consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms
that it is not aware of any new information or data that materially affects the information included in the abovementioned announcement.
page 17
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Sultan Resources Limited
ABN
Quarter ended (“current quarter”)
35 623 652 522
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (9
months)
$A’000
-
-
(12)
(33)
(b) development
-
-
(c) production
-
-
(d) staff costs
(41)
(160)
(e) administration and corporate costs
(170)
(429)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
2
9
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other
-
25
1.9
Net cash from / (used in) operating
activities
(221)
(588)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
Share your feedback
Discover