ASX ANNOUNCEMENT
31 October 2023
JUNE QUARTERLY REPORT
For the period 1 s t July – 30 th September 2023
DAVID LEES
NON-EXECUTIVE DIRECTOR
CONTACT
Suite 11
23 Railway Road
Subiaco WA 6008
www.sultanresources.com.au
Sultan Resources Limited (“SLZ” or “the Company”) is pleased to provide shareholders with the following update for the
Company’s activities for the quarter ended 30th September 2023.
CANADIAN LITHIUM PROJECTS
Sultan continued on ground exploration at one of its two 100% owned lithium projects in Ontario, Canada, with assays reported
from the Ruddy Project, with low K/Rb ratios established for high proportion of pegmatites sampled, and a priority lithium target
area identified within an interpreted ‘Goldilocks’ Zone for further work confirmed and refined.
RUDDY PROJECT
The Company advised that initial reconnaissance exploration was completed at Ruddy during the quarter, with experienced
Canadian geological consultants, APEX Geoscience Ltd (APEX) conducting activities at its Ruddy Project in North Western Ontario
(refer Figures 5, 6). At Ruddy, the Company has established a priority exploration target from the interpreted LCT Goldilocks
Zone surrounding the Allison Lake Batholith which covers approximately 3.5km of east-west strike in the centre to south of the
Company’s Project.
Apex utilised four helicopter-supported geologists to conduct reconnaissance over the project, sampling priority outcrop,
including pegmatitic occurrences for lithium and associated elements; and veining (for gold) where appropriate. Progress was
assisted by a recent burn in the area which has increased visibility from the air, although thick deadfall (stacked fallen trees) up
to 1.5m height and new growth slowed ground traverses. Apex geologists observed multiple pegmatite occurrences of up to
30m outcrop and up to 15m width within the initial area of focus. Evidence of pegmatite fractionation minerals in the form of
apatite or beryl were observed in the field from limited available outcrop, which was generally heavily covered by mosses and
lichen.
Apex collected a total of 157 samples over 8 days in the field, with over 35% (55 samples) taken from pegmatitic occurrences
(refer Figure 3) and submitted to ALS laboratories in Canada for multi-element analysis including gold. The Company
subsequently received complete field observations from Apex geologists. In addition, analysis and interpretation by Sultan
incorporated the field work of Fingas1, whom spent 2 days ‘straight-line’ traversing a portion of the tenement in 2021 (refer
Figure 4) as part of a larger pegmatite survey of the northern Allison Batholith area. Fingus noted 6 additional pegmatites outside
the Apex pegmatite localities, and one coincident occurrence, highlighting the difficulty in observing outcrop at Ruddy and that
more field work will be required after this first phase of reconnaissance. The combined observations support a priority zone of
interest within the original LCT Goldilocks interpretation, radially distributed from the northern portion of the Allison Batholith.
After receipt of the assays, the results supported a priority zone of interest within the original LCT Goldilocks interpretation,
ASX ANNOUNCEMENT –31 OCTOBER 2023
radially distributed from the northern portion of the Allison Batholith, and highlight a priority target (Refer Figures 1-4) for
further assessment in the SE portion of the Ruddy tenure.
Review of the data highlighted general lithium anomalism and coupled with rock/field relationships in the area suggested
that additional outcrops previously classified as ‘felsic’, ‘granitic’ and other indeterminate rock types in the field should be
reclassified as likely pegmatitic in nature, with a further 33 samples falling in this category, or around 56% of samples
assayed.
The Company has reviewed resultant lithium values and geochemical markers such as K/Rb ratios to focus additional
fieldwork to discover possible covered mineralised LCT pegmatites. Assays >100ppm Li20 are listed in Table 1 and depicted
in Figure 1. Values for ‘whole rock’ (i.e. from assay values, not from mica or feldspar crystal, which may further highlight
the substitution of Rb for K in the respective mineral lattice) K/Rb ratios below 65 are listed in Table 2, and depicted in
Figure 2. Lower K/Rb ratios are considered indicative of more evolved/fractionated pegmatitic occurrences, and a vector
for LCT pegmatite mineralisation.
Gold analysis returned 32 samples above the detection limit of 5 ppb to a maximum value of 33 ppb, with only 4 values
returned above 20ppb (refer Table 3). The Company considers these results weakly anomalous and continues to assess the
potential of the tenure for non-LCT mineralisation.
Photo 1. Aerial view across Ruddy Project looking East, Ruddy Lake in background.
page 2
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 1: Li20 Assays reporting above 100ppm at Ruddy Project in relation to tenure (refer Table 1).
Priority Zone area of focus for LCT Pegmatites in hatched area
Figure 2: Pegmatite locations demonstrating lower K/Rb ratios (refer Table 2), considered indicative of more evolved
pegmatitic occurrences, and a vector for LCT pegmatite mineralisation.
page 3
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 3: All sampled sites at Ruddy Project from June 2023 reconnaissance, includes reclassified pegmatitic occurrences.
Figure 4: Pegmatite sites at Ruddy Project; evolved pegmatites with fractionation minerals denoted by darker blue locations.
Geology after Fingus, 2022.
page 4
ASX ANNOUNCEMENT –31 OCTOBER 2023
Photo 2. Sample 10111, 614 ppm Li20, outcrop location (5674415mN, 551362mE UTM_Z15).
Photo 3. Sample 10112, 512 ppm Li20, 40 K/Rb ratio; outcrop location (5674528mN, 551592mE UTM_Z15).
Photo 4. Sample 10131, 523 ppm Li20; outcrop location (5676347mN, 551634mE UTM_Z15).
Photo 5. Sample 10329, 370 ppm Li20; 49 K/Rb ratio outcrop location (5675182mN, 549387mE UTM_Z15).
page 5
ASX ANNOUNCEMENT –31 OCTOBER 2023
Table 1: Significant rockchip results Ruddy reconnaissance (sorted) > 100pm Li 20
Sample_ID NAD83_Z15_E NAD83_Z15_N Li 20_ppm Cs_ppm
10111
10131
10112
10011
10245
10329
10007
10130
10232
10231
10113
10313
10311
10022
10101
10223
10029
10126
10226
10030
10216
10205
10303
10227
10302
10017
10308
10005
10230
10321
10120
10121
10128
10102
10316
10305
10327
10116
10044
10002
10110
10013
551362
551634
551592
551411
546530
549387
550126
550934
549379
549366
551648
551384
551321
547497
550302
547701
549526
549419
548178
549315
551499
549771
550511
546457
550363
551595
549959
550035
549435
548154
547471
548026
549358
549927
551170
550735
549565
552485
546362
550822
550396
551392
5674415
5676347
5674528
5674437
5677026
5675182
5675410
5676211
5674918
5675122
5674555
5674514
5674352
5677562
5674660
5677284
5675423
5675458
5677115
5675527
5675397
5675196
5674825
5677198
5674635
5675637
5675692
5675459
5675208
5677169
5677651
5677011
5675854
5674884
5674657
5675334
5675195
5675310
5676993
5674828
5675828
5675430
614
523
512
456
419
370
352
352
347
327
324
310
253
253
220
210
197
191
189
189
165
165
155
151
150
144
141
139
138
138
138
138
136
134
131
128
128
114
113
112
108
104
11
20
40
35
96
27
6
10
11
22
2
2
9
9
20
12
13
8
14
66
0
29
1
8
5
70
4
8
15
6
58
16
49
4
6
5
14
4
18
3
6
2
Ta_ppm Be_ppm Rb_ppm Nb_ppm K/Rb_calc
0
1
0
0
0
2
0
0
0
0
0
0
87
0
14
0
6
0
0
47
0
5
0
0
2
17
0
7
5
0
0
0
111
0
1
0
3
1
0
0
0
0
1
1
1
6
6
4
1
1
1
1
0
0
60
1
7
2
5
1
1
23
0
3
0
1
19
98
1
5
5
1
4
1
84
1
1
1
3
1
1
1
4
1
29
112
65
105
201
741
91
82
98
26
3
10
89
103
500
114
457
53
47
732
5
835
2
47
22
257
97
355
562
93
128
105
637
79
36
73
482
126
45
80
25
53
6
6
1
2
5
19
5
5
6
2
1
1
106
3
38
6
32
3
5
47
2
19
1
4
5
38
3
38
22
6
5
6
70
5
3
5
14
6
4
3
2
5
204
214
40
104
117
49
250
218
204
263
286
144
64
240
65
275
42
173
197
47
577
55
474
368
241
31
154
36
55
252
253
273
27
317
208
244
60
196
330
279
97
231
page 6
ASX ANNOUNCEMENT –31 OCTOBER 2023
Table 2: Significant rockchip results from pegmatites at Ruddy sorted on increasing K/Rb, cut to 65
Sample_ID NAD83_Z15_E NAD83_Z15_N Li 20_ppm Cs_ppm
10115
10128
10214
10017
10124
10201
10041
10005
10109
10015
10239
10112
10029
10307
10312
10209
10127
10207
10220
10103
10030
10010
10215
10329
10125
10218
10211
10009
10203
10230
10205
10204
10306
10233
10327
10107
10006
10241
10213
10234
10206
10229
10311
10106
10101
10105
551998
549358
551398
551595
546290
549972
549974
550035
550038
551253
549476
551592
549526
549886
551302
550154
549333
550044
551682
549760
549315
550762
551135
549387
549530
551151
550775
550602
549654
549435
549771
549728
549988
549488
549565
549858
550083
549899
551297
549967
549846
549550
551321
549783
550302
549727
5675134
5675854
5674526
5675637
5677214
5674893
5676521
5675459
5675678
5675741
5676341
5674528
5675423
5675609
5674373
5675401
5675530
5675466
5675616
5674981
5675527
5675244
5674631
5675182
5675429
5675755
5675243
5675229
5675188
5675208
5675196
5675188
5675271
5674811
5675195
5675452
5675472
5676488
5674329
5675138
5675443
5675229
5674352
5675200
5674660
5675185
31
136
54
144
73
82
38
139
99
63
11
512
197
55
37
50
56
58
59
96
189
28
26
370
83
35
31
68
102
138
165
73
57
55
128
62
36
49
60
19
90
81
253
67
220
77
Ta_ppm Be_ppm Rb_ppm Nb_ppm Sn_ppm K/Rb_calc
23
49
19
70
33
43
29
8
115
37
24
40
13
17
16
14
18
10
10
14
66
15
14
27
12
19
15
24
17
15
29
9
8
20
14
10
15
71
6
34
16
12
9
23
20
24
10
111
18
17
16
51
80
7
53
36
29
6
12
6
13
3
3
12
9
47
3
5
2
4
13
3
9
2
5
5
3
5
4
3
2
15
47
26
9
5
3
87
6
14
2
5
84
67
98
8
55
57
5
88
33
135
1
5
14
4
5
4
4
36
6
23
5
6
4
5
7
5
6
4
5
3
5
5
5
3
4
4
89
93
32
4
3
60
4
7
3
318
637
401
257
1035
1150
468
355
1035
476
435
65
457
518
657
420
621
397
207
381
732
475
524
741
649
656
647
644
549
562
835
294
427
631
482
352
581
620
52
819
621
511
89
693
500
636
32
70
44
38
54
116
69
38
82
54
65
1
32
57
39
46
15
19
21
37
47
27
17
19
23
31
23
44
12
22
19
10
23
17
14
13
24
62
46
24
24
13
106
14
38
11
29
14
16
7
12
30
10
8
152
16
10
2
9
8
11
10
5
5
7
10
13
14
3
8
7
9
10
39
4
6
5
3
9
8
5
4
4
30
22
10
7
4
20
3
31
3
26
27
29
31
32
33
34
36
37
38
40
40
42
42
44
44
44
45
45
46
47
48
48
49
50
52
53
54
54
55
55
56
57
58
60
60
60
61
62
62
63
63
64
64
65
65
Table 3: Gold assays >20 ppb from Ruddy June 2023 reconnaissance
Sample_ID
10215
10201
10218
10202
NAD83_Z15_E
551135
549972
551151
549747
NAD83_Z15_N
5674631
5674893
5675755
5674980
Au_ppb
33
28
26
21
page 7
ASX ANNOUNCEMENT –31 OCTOBER 2023
ABOUT THE RUDDY LITHIUM PROJECT
The Ruddy Project (Figures 1-6) directly abuts ground to the west held by Green Technology Metals Limited (ASX: GT1) and is
located in the province of Ontario about 162km north-north-east of the town of Dryden. The Project covers around 10km 2 and
sits on the northern extremity of the Allison Lake Batholith, a fertile intrusive responsible for the development of proximal
fractionated pegmatites with potential to host lithium, caesium and tantalum (LCT) mineralisation 1,2,3.
Although there has been no documented exploration over the Ruddy Project claims, previous study of the area by the Ontario
Geological Survey (Breaks et al 20032) described the margin of the Allison Lake Batholith at the time as “…an important new
exploration target for rare-element mineralization and is the largest such granite thus far documented in Ontario…”.
Breaks et al 20032 considered the margin of the Batholith had high potential for further discoveries of rare element mineralization
that could occur in exo-contact, metasedimentary-hosted pegmatites or as internal pegmatites within the parent granite,
particularly in light of the common regional zonation sequence of rare-element pegmatites from beryl-rich into lithium-rich types.
This typically includes spodumene-type pegmatites in an interpreted ‘LCT Goldilocks Zone’ of increased fractionation from the
parent granite. With recent renewed interest in rare element mineralisation, the prospective Allison Batholith has emerged as a
fully staked, multi-company, battery mineral exploration region.
Reports by Green Technology Metals3 describe the identification of the spodumene-bearing Ouroboros Pegmatites approximately
10km southwest of the Ruddy Project (refer Figure 6) in a similar geological setting, which the Company considers highly
encouraging. The Company is focusing exploration at Ruddy at outcrop within the interpreted LCT Goldilocks Zone surrounding
the Allison Lake Batholith, covering approximately 3.5km of east-west strike in the centre to south of the Company’s Project.
KEMBER PROJECT
At the Kember Project (refer Figure 5 &7), the Company had previously advised that a desktop review had highlighted a series of
pegmatitic granite occurrences in mapping previously conducted at its Kember Project, noted across an area around seven km in
length and typically over a kilometre in width. These will form a focus of initial exploration activities at the Kember Project.
The Company has opted to delay reconnaissance activities at Kember after one of four First Nation groups with established rights
in the area requested additional time to inform its members of planned activities.
The Company continues to negotiate directly with this and other FN group and will deliver a revised timetable for the first pass
reconnaissance exploration of Kember in due course, ideally to combine with additional groundwork at Ruddy, which can be
combined in daily helicopter flights out of Red Lake, ON.
ABOUT THE KEMBER LAKE LITHIUM PROJECT
The Kember Project (Figures 5 and 7) is located in the province of Ontario about 180km north of the town of Red Lake, covering
an area of around 30km2. Demonstrating the prospectivity of this area, the Kember Project is located about 8km from the
PAK/Bolt/Spark lithium deposits of Frontier Lithium Inc. (Frontier) and is contiguous with this project tenure.
Recent drilling by Frontier intersected 398.25m of pegmatite averaging 1.88% Li2O, including a 23.4m zone of 3.12% Li2O (see
TSX.V Announcement 8/02/2023). Frontier have also recently announced resources totalling 58.5Mt @ 1.51% Li2O from its most
recent NI43-101 instrument effective April 28th 2023, calculated from two of four known spodumene-bearing pegmatite
occurrences within its PAK Project holdings.
page 8
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 5: Location of Kember and Ruddy Projects in relation to known Lithium deposits, Northwest Ontario
N.B. PAK (TSXV:FL) total resource taken from NI43-101 instrument effective April 28, 2023
Mavis resource (ASX:CRR) taken from ASX release dated June 7, 2023
Root Bay, Seymour Lake and McCombe resources (ASX:GT1) taken from ASX release dated May 5, 2023
Georgia Lake (TSXV:RCK) total resource taken from Georgia Lake Project: Pre-Feasibility Study Nov 22, 2022
Separation Rapids (TSX:AVL) total resource taken from NI43-101 instrument effective Sept 26, 2018
Jackpot (Imagine Lithium- private) estimate taken from Ontario Mineral Inventory Record: MDI42E05SW00019; resource is historic and not
compliant with formal resource reporting.
page 9
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 6: Location of Ruddy Project in relation to regional geology, known pegmatite occurrences (detail sourced from ASX:GT1
Announcement on 24/01/2022), and neighbouring tenure holders.
page 10
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 7: Location of Kember Project in relation to regional geology and known spodumene-hosted Lithium deposits, Northwest
Ontario.
There has been no recorded exploration over the Kember Project area, however, mapping by the Geological Survey of Ontario
has historically recorded the presence of pegmatitic granites over a northwest to southeast zone around seven km in length and
typically over a kilometre in width, providing an initial zone of interest.
These pegmatitic granites will be the focus of initial reconnaissance of 5 to 7 days duration, with four helicopter-supported
geologists from Canadian-based experienced geological consultants, APEX Geoscience conducting mapping and sampling of
priority outcrop. The Company considers rare element mineralisation can occur associated with internal pegmatites within the
parent granite. The Company will also conduct reconnaissance of the eastern edge of the project, closer to changes in granitic
composition and contact morphologies.
References
1. Fingas, J, 2022: Assessment Report on Crown Land for the Costello Lake Area – 2021 Prospecting Program, dated May 25th 2022
2. Breaks, F.W., J.B. Selway J.B and A.G. Tindle A.G. 2003, Ontario Geological Survey, Open File Report 6099, Fertile Peraluminous Granites and Related RareElement Mineralization in Pegmatites, Superior Province, North-West and North-East Ontario: Operation Treasure Hunt
3. Green Technology Metals (ASX:GT1) ASX Announcement: “Strategic lithium footprint substantially expanded” dated 24/01/2022
For further detail on the Kember and Ruddy Projects please refer to the following:
Sultan (ASX:SLZ) Announcement: 2023 “Sultan Resources enters agreement to acquire 100% interest in highly prospective Canadian lithium exploration ground in Ontario,
Canada” dated 17/03/2023
Sultan (ASX:SLZ) Announcement: 2023 “Sultan Completes Acquisition of Canadian Lithium Projects” dated 25/05/2023
Sultan (ASX:SLZ) Announcement: 2023 “Sultan Appoints Experienced Canadian Geological Team” dated 1/06/2023
Sultan (ASX:SLZ) Announcement: 2023 “Multiple mapped pegmatitic occurrences Kember Lithium Project” dated 14/06/2023
Sultan (ASX:SLZ) Announcement: 2023 “Multiple Pegmatite occurrences noted as exploration commences at Ruddy Project, North-Western Ontario” dated 26/6/2023
Sultan (ASX:SLZ) Announcement: 2023 “Priority Zone Identified at Ruddy Lithium Project, Ontario” dated 25/07/2023
Sultan (ASX:SLZ) Announcement: 2023 “Results Received at Ruddy Lithium Project” dated 22/09/2023
page 11
ASX ANNOUNCEMENT –31 OCTOBER 2023
WA PROJECTS
LAKE GRACE PROJECT
The Lake Grace Project consists of five large tenements (E70/5081, 5082, 5085, 5095 and 5179- refer Figure 12) in the Southwest
Terrane of Western Australia, containing the Kulin Hill Ni-Co Project in the North, and the Lake Grace Gold Project in the South,
surrounding the Griffin’s Find Gold Mine.
Rio Farm-in Tenement (E70/5082)
Rio Tinto Exploration Pty Limited (RTX) and Sultan have entered into option to farm-in and joint venture agreement in respect
of E70/5082, a portion of Sultan’s Lake Grace tenure (refer ASX announcement 21/6/2023). The Agreement allows RTX to
undertake preliminary exploration during an initial option period and then earn an 80% interest in E70/5082 by way of $2m of
exploration spend within 5 years, with Sultan retaining full ownership of its principal area of focus to date (Kulin Hill tenure on
E70/5095). Previously, RTX had identified a strong untested late time conductivity anomaly from a single line SKYTEM response
in the northern part of E70/5082, from 20km line-spaced data, coincident with a circular magnetic and radiometric anomaly,
which formed the basis for RTX’s entry to the option and farm-in arrangement.
During the quarter Sultan contracted New Resolution Geophysics (NRG) to undertake a helicopter-borne Electromagnetic (EM)
survey system on E70/5082, SW of Kulin in WA, funded by Rio Tinto Exploration. NRG flew a detailed (100m line-spaced)
helicopter-borne time-domain electromagnetic (HTDEM) survey in mid-August totalling around 80 line km over an area
approximately 4km SW of the wheatbelt town of Kulin (refer Figure 11).
Post-quarter end the Company released images and interpretation of the data by the Company and RTX. The heli-borne EM
survey has outlined a significant EM response over 750m in length and 230m in width, which may resolve to two targets with
further investigation (refer Figures 8 & 9) and is characterised by a strong late-time signal. The Company and RTX consider the
geological setting and EM response is suggestive of potential for magmatic nickel sulfide mineralisation (refer Figure 9).
Preliminary modelling of the target has now been completed by RTX consultants, with target depths for modelled plates starting
from approximately 70m below surface. Planning for initial RC Drilling to confirm the nature of the geophysical anomaly is
underway. The Company is pushing forward with gaining relevant approvals to undertake drill testing of the EM target at the
earliest opportunity.
RTX have signalled an intention to the Company to exercise its option over E70/5082, and fund drilling of the EM anomaly, with
the Company expecting formal notice of this imminently. In addition, the Company has recently applied for open ground
contiguous with E70/5082 around the current area of interest, with 3 tenements (E70/6529-31) totalling 17 blocks having since
been granted (refer Figures 11 & 12, and schedule of tenements).
Previous ASX announcements related to this Project are listed below:
SLZ:ASX announcement 21/06/23: “Rio Tinto and Sultan enter into Option and JV Agreement”
SLZ:ASX announcement 16/08/23: “Helicopter EM Survey Commences at Rio-Sultan Ground”
SLZ:ASX announcement 24/10/23: “EM Survey Confirms Significant Geophysical Anomaly”
page 12
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 8: Channel 24Z EM response image overlain on aerial photography. EM data also highlights the position of the Tier 3
Narrogin-Kulin rail line, closed since 2013.
page 13
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 9: Channel 34Z EM response image overlaying greyscale aeromagnetics from Sultan 2017 survey. Original SKYTEM line
denoted by light blue flight line. Section Line A -B for Figure 3 below highlighted in white. Flight lines are 100m spacing.
Figure 10: AEM conductivity response for Heli-EM flight line over E70/5082, for section line A- B Figure 9.
page 14
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 11: EM anomaly in relation to Kulin township, with location of recently granted applications (E70/6529-31)
page 15
ASX ANNOUNCEMENT –31 OCTOBER 2023
Figure 12: Overview Plan of Sultan’s Kondinin-Lake Grace Project in the Southwest Terrane of WA, with RTX farm-in/JV tenement
E70/5082 and current area of interest highlighted.
page 16
ASX ANNOUNCEMENT –31 OCTOBER 2023
Kulin Hill Nickel-Copper-PGE Project (E70/5095)
Sultan’s principal area of focus is the Kulin Hill Nickel-Copper-PGE Project on E70/5095, where a greater than 2km long/700m
wide ultramafic/mafic package, characterised by a strong magnetic signal coincident with a salt lake surface expression is under
investigation.
The potential for Ni-Co sulfide mineralisation was suggested by historical drilling conducted on the edge of the sequence in 1967
and 1973, where drill core samples were observed in polished sections containing “…less than 1% of a nickel-cobalt-sulphide
mineral (approximately 50% Ni, 5% Co)4”. Observations from the historical drilling also supported some fractionation of the
ultramafic at depth; that is, towards the untested central portion of the sequence.
Figure 13: Plan view of 1VD magnetic signature representing the ultramafic sequence overlain by aerial photography
highlighting the salt lake, with Reserve 18455 (Lot 225568) highlighted in red. Sultan’s 2022 aircore collars are marked in
orange, and previous diamond drilling traces in yellow, with recent SLGDD001 named. Orange circles and traces indicate
provisional drilling collar positions to test the layered intrusion correctly.
Previous 2022 aircore drilling from available sites at the project by Sultan has returned anomalous results of Ni, Cr, Mg, Fe, S and
Co consistent with weathered ultramafic lithologies. The Company contends that further drilling into the ultramafic sequence
will support that it is fertile and can host precipitated Ni-Co sulfides.
Sultan drilled stratigraphic drill hole SLGDD001 in late 2022 to partially test a portion of the Kulin Hill magnetic anomaly (refer
Figure 13). Together, the thick intersection of layered ultramafic geology, along with evidence for the potential remobilisation
page 17
ASX ANNOUNCEMENT –31 OCTOBER 2023
of sulfides from an ultramafic source in SLGDD001, confirmed the prospectivity of the 2.2km long main target for Ni-Co
mineralisation. Interpretation of the geology of the sequence is ongoing.
During the quarter the company flew 3 pairs of EM lines (two central to the target, and a north and south pair as ‘controls’ for
the exercise- refer Figure 14) over E70/5095, taking advantage of the availability of the Helicopter for the E70/5082 survey on
the same morning. Technical expectations were low given the typical high conductance of salt lakes with hypersaline surfaces,
but with the influx of fresher water from winter rainfalls there was the possibility that conditions were optimal for the EM system
to penetrate the conductive blanket. Results confirmed that the northernmost and central lines could not test basement due to
high ground conductivity, however the southernmost lines tested basement, with less saline drainage in that area. No discrete
late time conductors were observed in the southern lines, which did not constitute part of the current Kulin Hill target.
Figure 14: Plan view of EM Flight lines over magnetics, Kulin Hill Target.
Access to Reserve 18455
As previously advised, negotiations to access the full extent of the target area for drilling, the majority of which extends beneath
salt lake Reserve 18455 (refer Figure 13), have been ongoing since early 2022, with the Company receiving confirmation of access
from DMIRS during late last year; however ground conditions have been unsuitable since receiving permission to drill.
Recent reconnaissance in August over the project confirmed that the salt lake surface was currently impassable from seasonal
rains and would require drying sufficiently to allow access. The Company remains in communication with a suitable diamond
drilling contractor with suitable depth and low angle capacity, small footprint including lightweight tracked mobility, and solids
and water management capacity to responsibly undertake this work.
4. A Report 7659 “Final Report Corrigin Project, Electrolytic Zinc Company of Australasia Limited” dated 1973
For further detail on the Kulin Hill/ Lake Grace Nickel Project please refer to the following:
Sultan (ASX:SLZ) ASX Announcement: 2021 “WA Nickel Project Update” dated 3/06/2021
Sultan (ASX:SLZ) ASX Announcement: 2021 “Drilling for WA Julimar-style Nickel Targets to Commence” dated 23/11/2021
Sultan (ASX:SLZ) ASX Announcement: 2021 “Aircore Drilling Commenced at Lake Grace” dated 16/12/2021
Sultan (ASX:SLZ) ASX Announcement: 2022 “Aircore Drilling Recommences at Lake Grace” dated 12/01/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Exploration Update” dated 3/02/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Aircore Results for Kulin Hill NI-Sulphide Target Received” dated 4/05/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Sultan to Drill Nickel Targets” dated 22/06/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Diamond Drill Hole Commences at Kulin Hill Nickel Project” dated 14/10/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Diamond Drill Hole Completed at Kulin Hill Nickel Project” dated 16/11/2022
Sultan (ASX:SLZ) ASX Announcement: 2023 “Initial Geochemistry Confirms Target Geology at Kulin Hill” dated 17/02/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Kulin Hill Nickel - Diamond Hole Confirms Prospectivity” dated 19/04/2023
page 18
ASX ANNOUNCEMENT –31 OCTOBER 2023
Lake Grace Gold Project (E70/5081, E70/5085, E70/5179)
No fieldwork undertaken during the quarter. Five year Extensions of Terms for E70/5081, E70/5082, E70/5085 and E70/5095
have been accepted and renewed by the Department for Mines, Industry Regulations and Safety of WA (DMIRS).
THADUNA PROJECT (E52/3481)
No fieldwork undertaken during the quarter.
LACHLAN FOLD BELT PROJECT, NSW (EL8734, EL8735, EL9070)
During the quarter, Sultan continued to review exploration data across its suite of porphyry and epithermal exploration targets
in the Macquarie Arc volcanic rocks of the Lachlan Fold Belt, NSW (refer Figure 14). No field work was undertaken, with further
review required to define the next round of exploration and drill targets across the projects. Some planning of further
extensional soil sampling of the main anomalism is planned for Tucklan (EL8734).
Ringaroo
Big Hill,
Razorback
Figure 14: NSW- Sultan Tenements located over prospective Macquarie Arc sequence rocks with priority targets indicated.
page 19
ASX ANNOUNCEMENT –31 OCTOBER 2023
CORPORATE
Sultan’s cash position as at 30 September 2023 was ~$0.785 million.
ADDITIONAL ASX INFORMATION
ASX Listing Rule 5.3.1
Exploration and Evaluation during the quarter was ~$366,000.
ASX Listing Rule 5.3.2
There was no substantive mining production and development activities during the quarter.
ASX Listing Rule 5.3.5
Payments to Related Parties & their Associates
Total Amount
Director Fees and Superannuation
$38,195
Company Secretarial, Registered Office and Financial Management Services
$26,805
page 20
ASX ANNOUNCEMENT –31 OCTOBER 2023
ASX Listing Rule 5.3.3
SCHEDULE OF TENEMENTS
Western Australia
Tenement
Holder
Status
Area
Sultan Resources
Live
1 block
Application
Required
Grant Date
Expiry Date
19/10/2016
8/02/2018
7/02/2028
$10,000
Date
Expenditure
Thaduna Project
E52/3481
Lake Grace Project
E70/5081
Sultan Resources
Live
58 blocks
21/11/2017
23/07/2018
22/07/2028
$87,000
1
Sultan Resources
Live
37 blocks
23/11/2017
31/07/2018
30/07/2028
$55,500
E70/5085
Sultan Resources
Live
65 blocks
24/11/2017
23/07/2018
22/07/2028
$93,000
E70/5095
Sultan Resources
Live
54 blocks
1/12/2017
31/07/2018
30/07/2028
$81,000
E70/5179
Sultan Resources
Live
28 blocks
1/6/2018
05/02/19
04/02/2024
$39,000
E70/6529
Sultan Resources
Live
1 block
15/8/2023
18/10/23
17/10/202
Share your feedback
Discover