Sultan Resources Limited (“SLZ” or “the Company”) is pleased to provide shareholders with the following update for the
Company’s activities for the quarter ended 30th June 2023.
CANADIAN LITHIUM PROJECTS
During the quarter, Sultan commenced on ground exploration at one of its two 100% owned lithium projects in Ontario, Canada
(refer ASX Announcement 26/06/2023).
RUDDY PROJECT
The Company advised that exploration has commenced at the Company’s Canadian projects, with experienced Canadian
geological consultants, APEX Geoscience Ltd (APEX) conducting activities at its Ruddy Project in North Western Ontario (refer
Figures 1, 2). At Ruddy, the Company has established a priority exploration target from the interpreted LCT Goldilocks Zone
surrounded the Allison Lake Batholith which covers approximately 3.5km of east-west strike in the centre to south of the
Company’s Project.
Apex utilised four helicopter-supported geologists to conduct reconnaissance over the project, sampling priority outcrop,
including pegmatitic occurrences for lithium and associated elements; and veining (for gold) where appropriate. Progress has
been assisted by a recent burn in the area which has increased visibility from the air, although thick deadfall (stacked fallen trees)
up to 1.5m height and new growth slowed ground traverses. Apex geologists observed multiple pegmatite occurrences of up to
30m outcrop and up to 15m width within the initial area of focus. Evidence of pegmatite fractionation minerals in the form of
apatite or beryl were observed in the field from limited available outcrop, which is generally heavily covered by mosses and
lichen.
Post-quarter end, the Company advised that Apex had collected a total of 157 samples over 8 days in the field, with over 35%
(55 samples) taken from pegmatitic occurrences (refer Figure 3). The samples have been submitted to ALS laboratories in Canada
for multi-element analysis including gold. The Company intends to use resultant lithium values and geochemical markers such
as K/Rb ratios to focus additional fieldwork to discover possible covered mineralised LCT pegmatites.
The Company subsequently received complete field observations from Apex geologists and continues to work through the
observations. In addition, analysis and interpretation by Sultan incorporated the field work of Fingas1, whom spent 2 days
‘straight-line’ traversing a portion of the tenement in 2021 (refer Figure 4) as part of a larger pegmatite survey of the northern
Allison Batholith area. Fingus noted 6 additional pegmatites outside the Apex pegmatite localities, and one coincident
occurrence, highlighting the difficulty in observing outcrop at Ruddy and that more field work will be required after this first
phase of reconnaissance. The combined observations support a priority zone of interest within the original LCT Goldilocks
interpretation, radially distributed from the northern portion of the Allison Batholith.
ASX ANNOUNCEMENT –28 JULY 2023
ABOUT THE RUDDY LITHIUM PROJECT
The Ruddy Project (Figures 1,2,3,4) directly abuts ground to the west held by Green Technology Metals Limited (ASX: GT1) and
is located in the province of Ontario about 162km north-north-east of the town of Dryden. The Project covers around 10km2
and sits on the northern extremity of the Allison Lake Batholith, a fertile intrusive responsible for the development of proximal
fractionated pegmatites with potential to host lithium, caesium and tantalum (LCT) mineralisation1,2,3.
Previous study of the area by the Ontario Geological Survey (Breaks et al 20032) described the margin of the Allison Lake Batholith
at the time as “…an important new exploration target for rare-element mineralization and is the largest such granite thus far
documented in Ontario…”. Breaks et al 20032 considered the margin of the Batholith had high potential for further discoveries
of rare element mineralization that could occur in exo-contact, metasedimentary-hosted pegmatites or as internal pegmatites
within the parent granite, particularly in light of the common regional zonation sequence of rare-element pegmatites from berylrich into lithium-rich types. This typically includes spodumene-type pegmatites in an interpreted ‘LCT Goldilocks Zone’ of
increased fractionation from the parent granite. With recent renewed interest in rare element mineralisation, the prospective
Allison Batholith has emerged as a fully staked, multi-company, battery mineral exploration region.
Reports by Green Technology Metals3 describe the identification of the spodumene-bearing Ouroboros Pegmatites
approximately 10km southwest of the Ruddy Project (refer Figure 4) in a similar geological setting, which the Company considers
highly encouraging. The Company intends to focus priority exploration at Ruddy at outcrop within the interpreted LCT Goldilocks
Zone surrounding the Allison Lake Batholith, covering approximately 3.5km of east-west strike in the centre to south of the
Company’s Project.
Photo 1. View to Ruddy Project looking SSE, Ruddy Lake in foreground.
page 2
ASX ANNOUNCEMENT –28 JULY 2023
Photo 2. Aerial view, pegmatite outcrops, Ruddy Project, Helicopter and pad visible RHS for scale.
Photo 3. Aerial view, pegmatite outcrop example, Ruddy Project, visible outcrop estimate 20-30m length.
page 3
ASX ANNOUNCEMENT –28 JULY 2023
Figure 1: Location of Kember and Ruddy Projects in relation to known Lithium deposits, Northwest Ontario
N.B. PAK (TSXV:FL) total resource taken from NI43-101 instrument effective April 28, 2023
Mavis resource (ASX:CRR) taken from ASX release dated June 7, 2023
Root Bay, Seymour Lake and McCombe resources (ASX:GT1) taken from ASX release dated May 5, 2023
Georgia Lake (TSXV:RCK) total resource taken from Georgia Lake Project: Pre-Feasibility Study Nov 22, 2022
Separation Rapids (TSX:AVL) total resource taken from NI43-101 instrument effective Sept 26, 2018
Jackpot (Imagine Lithium- private) estimate taken from Ontario Mineral Inventory Record: MDI42E05SW00019; resource is historic and not
compliant with formal resource reporting.
page 4
ASX ANNOUNCEMENT –28 JULY 2023
Figure 2: Location of Ruddy Project in relation to regional geology, known pegmatite occurrences (detail sourced from
ASX:GT1 Announcement on 24/01/2022), and neighbouring tenure holders.
page 5
ASX ANNOUNCEMENT –28 JULY 2023
Figure 3: All sampled sites at Ruddy Project in relation to tenure at completion of June 2023 reconnaissance
Figure 4: Observed Pegmatite sites at Ruddy Project; evolved pegmatites with fractionation minerals denoted by darker
blue locations. Priority Zone area of focus for LCT Pegmatites in hatched area. Geology after Fingus, 2022.
page 6
ASX ANNOUNCEMENT –28 JULY 2023
KEMBER PROJECT
At the Kember Project, the Company advised (refer ASX Announcement 14/06/2023) that a desktop review had highlighted a
series of pegmatitic granite occurrences in mapping previously conducted at its Kember Project, noted across an area around
seven km in length and typically over a kilometre in width. These will form a focus of initial exploration activities at the Kember
Project.
As recently advised (refer ASX Announcement 26/6/2023) the Company has opted to delay reconnaissance activities at Kember
after one of four First Nation groups with established rights in the area requested additional time to inform its members of
planned activities. The Company will deliver a revised timetable for this exploration in due course, ideally to combine with
mobilisation after receipt and assessment of Ruddy assay results.
ABOUT THE KEMBER LAKE LITHIUM PROJECT
The Kember Project (Figures 1 and 5) is located in the province of Ontario about 180km north of the town of Red Lake, covering
an area of around 30km2. Demonstrating the prospectivity of this area, the Kember Project is located about 8km from the
PAK/Bolt/Spark lithium deposits of Frontier Lithium Inc. (Frontier) and is contiguous with this project tenure.
Recent drilling by Frontier intersected 398.25m of pegmatite averaging 1.88% Li2O, including a 23.4m zone of 3.12% Li2O (see
TSX.V Announcement 8/02/2023). Frontier have also recently announced resources totalling 58.5Mt @ 1.51% Li2O from its most
recent NI43-101 instrument effective April 28th 2023, calculated from two of four known spodumene-bearing pegmatite
occurrences within its PAK Project holdings.
There has been no recorded exploration over the Kember Project area, however, mapping by the Geological Survey of Ontario
has historically recorded the presence of pegmatitic granites over a northwest to southeast zone around seven km in length and
typically over a kilometre in width, providing an initial zone of interest.
Figure 5: Location of Kember Project in relation to regional geology and known spodumene-hosted Lithium deposits,
Northwest Ontario
page 7
ASX ANNOUNCEMENT –28 JULY 2023
These pegmatitic granites will be the focus of initial reconnaissance of 5 to 7 days duration, with four helicopter-supported
geologists from Canadian-based experienced geological consultants, APEX Geoscience conducting mapping and sampling of
priority outcrop. The Company considers rare element mineralisation can occur associated with internal pegmatites within the
parent granite. The Company will also conduct reconnaissance of the eastern edge of the project, closer to changes in granitic
composition and contact morphologies.
The Company approved the acquisition of the Ruddy and Kember lithium projects at a General Meeting on 9 May 2023.
References
1. Fingas, J, 2022: Assessment Report on Crown Land for the Costello Lake Area – 2021 Prospecting Program, dated May 25th 2022
2. Breaks, F.W., J.B. Selway J.B and A.G. Tindle A.G. 2003, Ontario Geological Survey, Open File Report 6099, Fertile Peraluminous Granites and Related RareElement Mineralization in Pegmatites, Superior Province, North-West and North-East Ontario: Operation Treasure Hunt
3. Green Technology Metals (ASX:GT1) ASX Announcement: “Strategic lithium footprint substantially expanded” dated 24/01/2022
For further detail on the Kember and Ruddy Projects please refer to the following:
Sultan (ASX:SLZ) ASX Announcement: 2023 “Sultan Resources enters agreement to acquire 100% interest in highly prospective Canadian lithium exploration ground in
Ontario, Canada” dated 17/03/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Sultan Completes Acquisition of Canadian Lithium Projects” dated 25/05/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Sultan Appoints Experienced Canadian Geological Team” dated 1/06/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Multiple mapped pegmatitic occurrences Kember Lithium Project” dated 14/06/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Multiple Pegmatite occurrences noted as exploration commences at Ruddy Project, North-Western Ontario” dated
26/6/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Priority Zone Identified at Ruddy Lithium Project, Ontario” dated 25/07/2023
WA PROJECTS
LAKE GRACE PROJECT
The Lake Grace Project consists of five large tenements (E70/5081, 5082, 5085, 5095 and 5179- refer Figure 6) in the Southwest
Terrane of Western Australia, containing the Kulin Hill Ni-Co Project in the North, and the Lake Grace Gold Project in the South,
surrounding the Griffin’s Find Gold Mine.
Rio Farm-in Tenement (E70/5082)
During the quarter the Company announced that Rio Tinto Exploration Pty Limited (RTX) and Sultan had entered into option to
farm-in and joint venture agreement in respect of E70/5082, a portion of Sultan’s Lake Grace tenure (refer ASX announcement
21/6/2023). The Agreement allows RTX to undertake preliminary exploration during an initial option period and then earn an
80% interest in E70/5082 by way of $2m of exploration spend within 5 years, with Sultan retaining full ownership of its principal
area of focus to date (Kulin Hill tenure on E70/5095).
Terms of the Option Agreement
The material terms of the Option Agreement are as follows: RTX pays Sultan $25,000 and has the right to exclusively conduct a
preliminary stage of exploration over the Option Tenure for 6 months (Option Period). At its election, RTX may extend the Option
Period by an additional 6 months, by paying Sultan a further $25,000.
At any time during the Option Period, RTX may elect to farm-in to the Option Tenure and earn an 80% joint venture interest in
the Option Tenure by way of sole funding $2m of exploration activity, including a minimum of 1,000m of RC and/or diamond
drilling. RTX has 5 years to meet the minimum farm-in expenditure requirement but agrees that should it not be met by 3 years
page 8
ASX ANNOUNCEMENT –28 JULY 2023
and should it wish to continue in the farm-in then it shall pay Sultan $50,000 (provided that RTX has had reasonable access to
the Option Tenure in order to conduct exploration activities).
On meeting the farm-in expenditure and drilling requirements, a standard 80/20 contributing joint venture (JV) is formed. Should
a party’s interest in the JV dilute to below 10%, the other party may buyout the interest at fair market value or otherwise the
interest shall be converted to a 1% net smelter royalty payable for the first 5 years of commercial production. For the duration
of the Option Period, RTX is responsible for all rents and required expenditure on E70/5082 and is granted a right of first refusal
over the sale or disposal by Sultan of the balance of its Lake Grace tenure package, namely E70/5095, E70/5085, E70/5081 and
E70/5179.
Figure 6: Overview Plan of Sultan’s Southwest Terrance Lake Grace Project in WA
page 9
ASX ANNOUNCEMENT –28 JULY 2023
Kulin Hill Nickel-Copper-PGE Project (E70/5095)
During the March quarter, Sultan provided results for the stratigraphic drill hole SLGDD001 completed to partially test a portion
of the Kulin Hill magnetic anomaly. Previous 2022 aircore drilling from available sites at the project by Sultan has returned
anomalous results of Ni, Cr, Mg, Fe, S and Co consistent with weathered ultramafic lithologies. The Company contends that
further drilling into the ultramafic sequence will support that it is fertile and can host precipitated Ni-Co sulfides. The potential
for Ni-Co sulfide mineralisation was suggested by historical drilling conducted on the edge of the sequence in 1967 and 1973,
where drill core samples were observed in polished sections containing “…less than 1% of a nickel-cobalt-sulphide mineral
(approximately 50% Ni, 5% Co)4”. Observations from the historical drilling also supported some fractionation of the ultramafic
at depth; that is, towards the untested central portion of the sequence.
SLGDD001 Drill Hole Details
In late 2022, the company completed a deep (489.4m) stratigraphic diamond hole (SLGDD001) mineralisation at Kulin Hill
designed to investigate the nature of the layered ultramafic sequence beneath the weathering horizon, and to partially assess
the potential for Ni-Co sulfide mineralisation associated with this type of sequence. SLGDD001 was collared in the vicinity of the
2022 drilled aircore holes and was drilled at -600 towards the southeast, targeting across a westernmost extremity of a strong
magnetic body within the sequence (Figure 7).
Figure 7: Plan view of 1VD magnetic signature representing the ultramafic sequence overlain by aerial photography
highlighting the salt lake, with Reserve 18455 (Lot 225568) highlighted in red. Sultan’s 2022 aircore collars are marked in
orange, and previous diamond drilling traces in yellow, with recent SLGDD001 named. Orange circles and traces indicate
provisional drilling collar positions to test the layered intrusion correctly.
page 10
ASX ANNOUNCEMENT –28 JULY 2023
Initial observations confirmed a significant thickness of the ultramafic/mafic target sequence was intersected down to 256m
down hole, with a 40m interlayer of felsic gneiss at 153.5m (refer Figure 8), before passing into a series of mostly felsic and
occasionally mafic gneisses. Weathering was observed to persist to about 70m down hole. A total of 160 samples were selected
for analysis. Results from the unweathered target sequence were strongly indicative of ultramafic lithologies, summarised as:
Nickel (Ni) content of 0.1-0.29% Ni; Chrome (Cr) content of 0.1-0.65% Cr; Magnesium oxide (MgO) content of 25-41% MgO; and
Silica oxide (SiO2) mostly below 35% SiO2.
The drilling encountered a 6.8m (downhole length) lens of sheared mafic-ultramafic below the main ultramafic unit from 289.7m
containing anomalous Pt and Pd (PGEs), Cu and S (Figure 8). In combination, these particular geochemical anomalies indicate
the potential presence of sulfide in the sheared mafic-ultramafic lens and suggest the possibility of remobilisation of sulfide from
an ultramafic source.
Figure 8: Cross-section of RC drill hole SLGD001 along with previous aircore drill holes SLGAC02, SLGAC03 and SLGAC04. Ni
is displayed as a concentration based coloured histogram on the right-hand side of the drill string, sulphur (S) on the lefthand side of the drill string and Pt + Pd as a concentration based colour within the drill string.
page 11
ASX ANNOUNCEMENT –28 JULY 2023
Together, the thick intersection of layered ultramafic geology, along with evidence for the potential remobilisation of sulfides
from an ultramafic source in SLGDD001, confirm the prospectivity of the 2.2km long main target for Ni-Co mineralisation.
Interpretation of the geology intersected in SLGDD001 is ongoing.
Access to Reserve 18455
As previously advised, negotiations to access the full extent of the target area for drilling, the majority of which extends beneath
salt lake Reserve 18455 (refer Figure 7), have been ongoing since early 2022, with the Company receiving confirmation of access
from DMIRS during late last year; however ground conditions have been unsuitable since receiving permission to drill.
Recent reconnaissance over the project confirmed that the salt lake surface was currently impassable from seasonal rains and
would require drying sufficiently to allow access, which the Company is currently planning for later in 2023. The Company is in
communication with a suitable diamond drilling contractor with suitable depth and low angle capacity, small footprint including
lightweight tracked mobility, and solids and water management capacity to responsibly undertake this work.
4. A Report 7659 “Final Report Corrigin Project, Electrolytic Zinc Company of Australasia Limited” dated 1973
For further detail on the Kulin Hill/ Lake Grace Nickel Project please refer to the following:
Sultan (ASX:SLZ) ASX Announcement: 2021 “WA Nickel Project Update” dated 3/06/2021
Sultan (ASX:SLZ) ASX Announcement: 2021 “Drilling for WA Julimar-style Nickel Targets to Commence” dated 23/11/2021
Sultan (ASX:SLZ) ASX Announcement: 2021 “Aircore Drilling Commenced at Lake Grace” dated 16/12/2021
Sultan (ASX:SLZ) ASX Announcement: 2022 “Aircore Drilling Recommences at Lake Grace” dated 12/01/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Exploration Update” dated 3/02/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Aircore Results for Kulin Hill NI-Sulphide Target Received” dated 4/05/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Sultan to Drill Nickel Targets” dated 22/06/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Diamond Drill Hole Commences at Kulin Hill Nickel Project” dated 14/10/2022
Sultan (ASX:SLZ) ASX Announcement: 2022 “Diamond Drill Hole Completed at Kulin Hill Nickel Project” dated 16/11/2022
Sultan (ASX:SLZ) ASX Announcement: 2023 “Initial Geochemistry Confirms Target Geology at Kulin Hill” dated 17/02/2023
Sultan (ASX:SLZ) ASX Announcement: 2023 “Kulin Hill Nickel - Diamond Hole Confirms Prospectivity” dated 19/04/2023
Lake Grace Gold Project (E70/5081, E70/5085, E70/5179)
No fieldwork undertaken during the quarter. Extensions of Term for these tenements and E70/5082 and E70/5095 have been
prepared for submission.
THADUNA PROJECT (E52/3481)
No fieldwork undertaken during the quarter. A five-year Extension of Term for this tenement was received during the quarter.
LACHLAN FOLD BELT PROJECT, NSW (EL8734, EL8735, EL9070)
During the quarter, Sultan continued to review exploration data across its suite of porphyry and epithermal exploration targets
in the Macquarie Arc volcanic rocks of the Lachlan Fold Belt, NSW (refer Figure 9), with the appointment of an experienced inhouse Exploration Manager.
No field work was undertaken, with further review required to define the next round of exploration and drill targets across the
projects. Annual reporting was submitted, and EL8704 relinquished.
page 12
ASX ANNOUNCEMENT –28 JULY 2023
Ringaroo
Big Hill,
Razorback
Figure 9: NSW- Sultan Tenements located over prospective Macquarie Arc sequence rocks with priority targets indicated.
CORPORATE
On 24 May 2023, the Company advised that it has successfully completed the second tranche of its recent placement
(Placement). In total, the Company issued 30m shares at $0.05 per share to raise $1.5m (pre costs) from resource experienced
sophisticated and high net worth investors.
Completion of the Placement paved the way for the acquisition (Acquisition) of 100% of the Kember and Ruddy lithium projects
in Ontario, Canada (Canadian Lithium Projects) from XS Minerals. Settlement of the Acquisition was completed on 29 May 2023
with the issue of consideration shares and payment of cash consideration to certain local Canadian vendors. For further details
of the key acquisition terms, please refer to ASX announcement dated 17 March 2023. Subject to local registration and
processing, Sultan now holds 100% of the Kember and Ruddy Projects which together comprise circa 39.3km2 of highly
prospective and sought after lithium exploration tenure.
Sultan’s cash position as at 30 June 2023 was ~$1.35 million.
page 13
ASX ANNOUNCEMENT –28 JULY 2023
ADDITIONAL ASX INFORMATION
ASX Listing Rule 5.3.1
Exploration and Evaluation during the quarter was ~$411,000. The majority of this was spent as payment to Canadian vendors
for the tenement acquisition of the Kember and Ruddy lithium projects.
ASX Listing Rule 5.3.2
There was no substantive mining production and development activities during the quarter.
ASX Listing Rule 5.3.5
Payments to Related Parties & their Associates
Total Amount
Director Fees and Superannuation
$45,342
Company Secretarial, Registered Office and Financial Management Services
$47,625
ASX Listing Rule 5.3.3
SCHEDULE OF TENEMENTS
Western Australia
Tenement
Holder
Status
Area
Sultan Resources
Live
1 block
Application
Required
Grant Date
Expiry Date
19/10/2016
8/02/2018
7/02/2028
$10,000
Date
Expenditure
Thaduna Project
E52/3481
Lake Grace Project
E70/50811
Sultan Resources
Live
58 blocks
21/11/2017
23/07/2018
22/07/2023
$87,000
E70/5082
Sultan Resources
Live
37 blocks
23/11/2017
31/07/2018
30/07/2023
$55,500
E70/5085
1
Sultan Resources
Live
65 blocks
24/11/2017
23/07/2018
22/07/2023
$93,000
E70/5095
1
Sultan Resources
Live
54 blocks
1/12/2017
31/07/2018
30/07/2023
$81,000
E70/5179
Sultan Resources
Live
28 blocks
1/6/2018
05/02/19
04/02/2024
$39,000
Grant Date
Expiry Date
1,2
New South Wales
Tenement
Holder
Stat
us
Area
Application
Date
Required
Expenditure
Lachlan Fold Belt Project
EL 8734
Colossus Metals
Live
16 Units
NA
16 April 2018
16 April 2025
$150,000
EL 8735
Colossus Metals
Live
37 Units
NA
16 April 2018
16 April 2025
$250,000
EL 9070
Sultan Resources
Live
4 Units
NA
2 March 2021
2 March 2027
$14,000
page 14
ASX ANNOUNCEMENT –28 JULY 2023
Canada 3
Tenement
Holder
Status
Area
711362
Perry English
Live
22 cells
711363
Perry English
Live
711364
Perry English
Application
Required
Grant Date
Expiry Date
NA
27/02/2022
27/02/2024
$8800
14 cells
NA
27/02/2022
27/02/2024
$5600
Live
16 cells
NA
27/02/2022
27/02/2024
$6400
Date
Expenditure
Ruddy Project
Kember Project
705989
Gravel Ridge
Live
25 cells
NA
08/02/2022
08/02/2024
$10,000
705990
Gravel Ridge
Live
25 cells
NA
08/02/2022
08/02/2024
$10,000
705991
Gravel Ridge
Live
25 cells
NA
08/02/2022
08/02/2024
$10,000
705992
Perry English
Live
25 cells
NA
08/02/2022
08/02/2024
$10,000
705993
Perry English
Live
25 cells
NA
08/02/2022
08/02/2024
$10,000
705994
Perry English
Live
25 cells
NA
08/02/2022
08/02/2024
$10,000
The mining tenements relinquished during the quarter and their location –EL8704, Lachlan Fold Belt NSW
The mining tenement interests acquired during the quarter and their location –Ruddy and Kember MC’s as listed
Beneficial percentage interests held in farm-in/farm-out agreements at the end of the quarter – 100% in E70/5082
Beneficial percentage interests held in farm-in/farm-out agreements acquired/disposed of during the quarter - nil
123-
Extensions of Term being submitted
E20/5082 subject to farm in by Rio Tinto Exploration- see SCN:ASX release dated 21st June 2023
All Canadian tenure in process of being transferred to Sultan Subsidiary
This announcement is authorised for release by the Board.
For further information contact:
Director
Jeremy King
info@sultanresources.com.au
Cautionary Statement: Investors are cautioned that information contained within this release in respect of pegmatite
occurrences is not necessarily indicative of lithium mineralization on the property, and that preliminary exploration
observations will need to be backed by laboratory analysis to ascertain the prospectivity of the mineral claims, and there
is no guarantee that a significant discovery will be made as a result of its exploration efforts.
Competent Persons Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on historical and
recent exploration information compiled by Mr Craig Hall, who is a Competent Person and a Member of the Australian
Institute of Geoscientists and a fulltime employee of Sultan Resources Limited. Mr Hall has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for the reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr Hall consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms
that it is not aware of any new information or data that materially affects the information included in the abovementioned announcement.
page 15
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Sultan Resources Limited
ABN
Quarter ended (“current quarter”)
35 623 652 522
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(58)
(68)
(b) development
-
-
(c) production
-
-
(d) staff costs
(47)
(167)
(e) administration and corporate costs
(370)
(687)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
3
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
37
37
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(435)
(882)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(332)
(332)
-
-
(21)
(335)
(e) investments
-
-
(f)
-
-
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(353)
(667)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
477
1,500
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(228)
(228)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
249
1,272
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,885
1,623
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(435)
(882)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(353)
(667)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
249
1,272